Modon Stage.1 Part 2 Residental Buildings
Baghdad, Iraq

Modon Stage.1 Part 2 Residental Buildings

Location: BAGDA/IRAQ
Contract Date: 7/2/22
Completion Date: 2/28/23
Duration: 387 days
Project Type: Apartments
State: Completed
Customer: M/s MODON FOR REAL-ESTATE DEVELOPMENT CO.
Main Contractor: BCM ULUS.MAD.INŞ.SAN VE TIC.A.S.
Scope of Work: Residential Building Project

Project Description:Modon Stage.1 Part 2 Residental Buildings project is located in Baghdad, Iraq and is an important project aimed at the construction of modern housing. The project started on February 7, 2022, and was completed on February 28, 2023 and lasted a total of 387 days.

This project was ordered by M/s MODON FOR REAL-ESTATE DEVELOPMENT CO., and was managed by BCM ULUS.MAD.İNŞ.SAN VE TİC.A.Ş. as the main contractor. The aim of the project is to meet the housing needs of the region by building high-quality apartment buildings in Baghdad.

Modon Stage.1 Part 2 is notable for its modern architectural design and durable construction techniques. This project aims to improve the quality of life by taking an important step in the residential area in Baghdad. The apartments built within the scope of the project have met the demand for housing in the region by offering comfortable living spaces and bringing modern living standards.

By successfully completing this project, BCM ULUS.MAD.İNŞ.SAN VE TİC.A.Ş., has made a significant contribution to the residential sector in Baghdad and set an example for future housing projects. The project has raised the standard of living in Baghdad with its solid infrastructure and modern design.